A complete LNG liquefaction plant includes three systems: process system, instrument control system and utility system. According to the different feed gas sources, it can be changed.
Process system introduction of LNG plant:
After Desanding, heating, pressure regulating and metering, the feed natural gas enters the natural gas pretreatment system, removes CO2, Hg, heavy hydrocarbon and H2O, enters the liquefaction cold box, is cooled, liquefied and supercooled in the plate fin heat exchanger, throttled and flashed to the flash tank, and the separated liquid phase enters the LNG storage tank as LNG products.
The main device of the unit are:
(1) Filtration, booster and metering unit
S/N |
Equipment Name |
Q’ty |
Remarks |
Filtration and metering skid |
|||
1 |
Meter |
1 set |
|
2 |
Filter separators |
2 sets |
Shell and tube type, heat transfer oil heating |
3 |
Fuel gas buffer tank |
1set |
|
Gas compression skid |
|||
4 |
Gas compressor |
2 sets |
1 work, 1 standby |
(2) Feed gas decarbonization unit
S/N |
Equipment name |
Q’ty |
Other instructions |
Decarbonization skid (1) |
|||
1 |
Absorption tower |
1 set |
Material: Q345R |
2 |
Reboiler |
1set |
Shell side: s30408, tube side: s30408 |
3 |
Regeneration tower |
1set |
Material: s30408 |
Decarbonization skid (2) |
|||
4 |
Gas liquid heat exchanger |
1set |
Air cooled |
5 |
Decarbonization gas separator |
1set |
Material: Q345R |
6 |
MDEA circulating pump |
2sets |
One for use and one for standby |
7 |
Flash separator |
1set |
Material: Q345R |
8 |
Rich and poor liquid heat exchanger |
1set |
Plate type |
9 |
Lean liquid cooler |
1set |
Air cooling |
10 |
Solution filter |
1set |
Material: Q345R, activated carbon 0.5m3 |
11 |
Acid gas cooler |
1set |
Air cooled |
12 |
Acid gas separator |
1set |
Material: s30408 |
13 |
Solution storage tank |
1set |
|
14 |
Underground storage tank |
1set |
|
15 |
Reflux pump |
2sets |
One for use and one for standby |
16 |
Defoamer tank |
1set |
|
17 |
Defoamer pump |
1set |
Material: Q345R |
(3) Dehydration and mercury removal unit of feed gas
S/N |
Equipment name |
Q’ty |
Remarks |
Dehydration and mercury removal skid |
|||
1 |
Dehydration adsorber |
3 ets |
Cycle switching |
2 |
Regeneration gas heater |
1set |
Electrical heating |
3 |
Regeneration gas cooler |
1set |
Air cooling |
4 |
Regeneration gas separator |
1set |
|
5 |
Mercury remover |
1set |
|
6 |
Dust filter |
2sets |
1 work, 1 standby |
(4) Feed gas heavy hydrocarbon removal unit
S/N |
Equipment name |
Q’ty |
Remarks |
Feed gas heavy hydrocarbon removal unit |
|||
1 |
Heavy hydrocarbon adsorber |
2 sets |
Cycle switching |
2 |
Regeneration gas heater |
1set |
Electrical heating |
3 |
Regeneration gas cooler A |
1set |
Air cooling |
4 |
Regeneration gas cooler B |
1set |
Air cooling |
5 |
Regeneration gas separator |
1set |
|
6 |
Dust filter |
2sets |
1 work, 1 standby |
(5) Cryogenic liquefaction unit
S/N |
Equipment name |
Q’ty |
remarks |
Liquefaction cold box (independent skid) |
|||
1 |
Liquefaction heat exchanger |
1 set |
Aluminum plate fin heat exchanger |
2 |
Refrigerant gas-liquid separator |
1 set |
Placed in the cold box |
3 |
Regulating valve |
1set |
|
4 |
Primary instrument |
1set |
|
5 |
Cryogenic piping and manual valves |
1set |
Stainless steel |
6 |
Cold box insulation material |
1 batch |
User Provide |
8 |
Heavy hydrocarbon separator |
1set |
Stainless steel |
8 |
Residual liquid vaporizer |
1set |
50Nm3/h |
9 |
Nitrogen heater |
2 sets |
50Nm3/h |
10 |
LNG buffer tank |
1set |
|
(6) MR cycle refrigeration unit
S/N |
Equipment name |
Q’ty |
remarks |
1 |
Refrigerant dryer |
1set |
Centrifugal type |
2 |
Refrigerant vaporizer |
1set |
|
3 |
High temperature refrigeration compressor |
1set |
Screw type |
4 |
Low temperature refrigeration compressor |
1set |
Screw type |
(7) LNG loading and BOG recovery unit
S/N |
Equipment name |
Q’ty |
remarks |
|
LNG loading unit |
||||
1 |
LNG loading crane pipe |
2 sets |
||
BOG recovery unit |
||||
1 |
BOG heater |
1set |
||
2 |
BOG compressor |
2setS |
1 work, 1 standby |
|
3 |
BOG water bath heater |
1set |
|
|
4 |
Fuel gas balance tank |
1set |
|
|
Contact:
Sichuan Rongteng Automation Equipment Co., Ltd.
Phone/WhatsApp/Wechat : +86 177 8117 4421 +86 138 8076 0589
Website: www.rtgastreat.com Email: info@rtgastreat.com
Address:No. 8, Section 2 of Tengfei Road, Shigao Subdistrict,Tianfu New Area, Meishan city, Sichuan China 620564
.
Post time: Dec-08-2023